245th Street Bank Stabilization

Project Scope

Valley Corporation was hired by Douglas County to stabilize the bank of the East Bank of the Elkhorn River at 245th and Q Streets. Starting on March 22, 2019, beginning with tree removal, and the use of imported soil and riprap, Valley was able to stabilize the banks with a clean, sturdy, dependable embankment. The project was finished and opened to the public on May 15, 2019.

Major items of work
  • Removal of 20 large trees
  • 8,550 CY of soil hauled in
  • 9,495 tons of riprap installed
  • Service Type:

    Stabilization

  • Owner:

    Douglas County

  • General Contractor:

    Valley Corporation