Western Sarpy Levee Rehabilitation

Project Scope

Hired by USACE, the Western Sarpy project focused on the rehabilitation of the levee system. This project began in November of 2019 and is slated for completion in April of 2020. Through levee surfacing, and the use of riprap, topsoil, fill material, and flexamat, all project milestones have been completed on time.

Major items of work
  • Use of 16,000 tons of riprap
  • 8,000 CY of topsoil
  • 7,000 CY of fill material
  • 6,000 Tons of levee surfacing
  • 45,000 SF of Flexamat
  • Service Type:

    Grading

  • Owner:

    US Army Corps of Engineers

  • General Contractor:

    Valley Corporation