Oakbrook Channel Stabilization

Project Scope

In June of 2017, Valley Corporation began work on the rehabilitation of a channel in Omaha. Valley was hired by the City of Omaha for the rehabilitation as well as the repair of a damaged storm sewer system. After extending the storm sewer pipe and installing an impact basin, the project was completed in May of 2018.

Major items of work
  • Extension of existing 60- inch storm sewer pipe by 54 feet
  • Installation of 25-foot-long by 18-foot-wide impact basin
  • Extensive grading of an approx. 400’ long section of channel
  • Sheetpile installation
  • 4 drop structures
  • CIPP Lining of approximately 350 LF of Existing 60 Inch Storm Sewer
  • Service Type:

    Structures

  • Owner:

    City of Omaha

  • General Contractor:

    Valley Corporation