Category: Stabilization

Q Street Flood Damage Repairs

During March 2019 our community experienced historic and devastating flooding.  Almost all roads leading into and out of Valley were compromised and several are still closed at the time of this post.  On March 22nd Valley Corporation was chosen to repair two segments of the Q street corridor.  We are pleased to announce that we… Read more »

Zorinsky Water Quality Basin Dam 2 Project

The Papio Missiouri River NRD has awarded a $4.2 million job to Valley Corporation for the Construction of Zorinsky Water Quality Basin Dam 2 Project, or “ZB2”.  The Water Quality Basin will be located near 204th and F Streets.  Once completed, ZB2 is designed to work in conjunction with the recently built basin, “ZB1”, on… Read more »

Hell Creek Grade Control Stablization

Papio Missouri NRD hired Valley Corporation as a General Contractor to protect a historic bridge and it abutments along an old railroad bed for the future construction of the West Papio walking and biking trail.  The bridge was originally constructed in 1905 for railroad use and has since been abandoned. The old sheet pile and concrete… Read more »

October 2016 Employee Anniversaries

“We are what we repeatedly do.  Excellence then, is not an act, but a habit.” ~Aristotle  At Valley Corporation our employees are family.   An Employee Anniversary date is something to be celebrated.  We’d like to say congratulations to the following excellent employees on their employment anniversary at Valley Corporation.  Thank You for your time,… Read more »