Written by on May 20, 2019

During March 2019 our community experienced historic and devastating flooding.  Almost all roads leading into and out of Valley were compromised and several are still closed at the time of this post.  On March 22nd Valley Corporation was chosen to repair two segments of the Q street corridor.  We are pleased to announce that we […]

Written by on May 11, 2018

The Papio Missiouri River NRD has awarded a $4.2 million job to Valley Corporation for the Construction of Zorinsky Water Quality Basin Dam 2 Project, or “ZB2”.  The Water Quality Basin will be located near 204th and F Streets.  Once completed, ZB2 is designed to work in conjunction with the recently built basin, “ZB1”, on […]

Written by on September 27, 2016

Billionaire Joe Rickets is building a retreat center, Cloisters on the Platte, just South of Gretna NE.   The building site is located on 930 acres of land near the Platte River.  Valley Corporation has begun excavation of the foundations on several lots.  Once the foundations are complete Valley Corp will install drainage tile around the perimeter […]