Oakbrook Channel Stabilization

PROJECT SCOPE

In June of 2017, Valley Corporation began work on the rehabilitation of a channel in Omaha. Valley was hired by the City of Omaha for the rehabilitation as well as the repair of a damaged storm sewer system. After extending the storm sewer pipe and installing an impact basin, the project was completed in May of 2018.

MAJOR ITEMS OF WORK

    • Extension of existing 60- inch storm sewer pipe by 54 feet
    • Installation of 25-foot-long by 18-foot-wide impact basin
    • Extensive grading of an approx. 400’ long section of channel
    • Sheetpile installation
    • 4 drop structures
    • CIPP Lining of approximately 350 LF of Existing 60 Inch Storm Sewer

Service Type: Structures

Owner: City of Omaha, Nebraska

General Contractor: Valley Corporation